Indoor and Outside Arenas Rebuilt
|
|
| Indoor Ring work | |
| On the indoor ring we scraped the rubber surface into a windrow down the middle of the ring. A layer of old wood footing product was then removed. This old material had broken down to a fine power and packed under the rubber. It would collect water over time resulting in slippery spots. We replaced this with 1.5 inches of course manufactured lime sand. Particle size is 2 - 4mm. |
|
| Indoor Ring Sand Addition | |
| Conveyor trucks spread the sand uniformly over the surface. By not dumping in piles, it made the initial leveling easier. Also with only 14 feet of clearance, we would have had to use many small trucks to bring in the sand. Rubber was re-spread and mixed. The ring is complete and open for use. Everyone seems pleased with the results. |
|
| Outdoor Ring | |
| All old footing was removed down to a surface of clean clay. The surface was leveled with a drainage slope to one side and then compacted with a vibratory double drum roller. |
|
| Outdoor Ring Base | |
| A second layer was added over the clay sub base. This was crushed limestone with fines to aid in packing. It was sloped to the same 1% side to side grade as the sub base and compacted with the road roller. Finally, 2.5 inches of stone sand was added as a riding surface. The new ring has a very uniform feel and is no longer dusty when dry. |
|